CIP For Esmeraldas Project In Ecuador

Esmeraldas Refinery Rehabilitation Project Phase II is located in Petroindustrial Industrial Complex in Esmeraldas, Nothern Ecuador. The factory was built in 1977 to be able to produce 55 thousand barrels.

After two extensions of facilities in 1987 and 1997, the factory was able to produce 110 barrels. However, its refining capacity has decreased because of obsolete equipments

In order to solve this problem, Petroecuador is planning to take two-step repair processes. SK Construction will take charge in the first step to repair FCC factory and perform a thorough examination on other refinery facilities. This project completed on late October, 2011.

KOVIS E&C awarded the Chemical Dosing System For Esmeraldas Project in Ecuador. Contractor: SK Engineering and Construction. Quantity: 12 packages. Time for completing project is 7 months (from December 1st 2010 to June 30th 2011).